Project Description
Project Description
Installation:
Mastic Asphalt
Description:
As the first part of a two phase project commenced on the East face of Leventhorpe Court. We had five 25m walkways that required a full strip and relay of the existing defective asphalt surfaces that. Each walkway had 5 to 6 flats on them that each required new asphalt to their porches. Each asphalt walkway was laid with added granite chippings providing a hard wearing surface suitable for heavy foot traffic.